//-->


 

An Old Spite - Is the Repair Method the Right One?


The repair method itself hopefully does not need to be defended anymore. The bridge was in a state of disrepair before the commencement of the repairs. This fact called for immediate action. Two approaches were introduced from which the current one has proven to be the more suitable, in the end. As opposed to the other one, it requires only a structural intervention with the internal parts of the bridge. Multiple renowned experts believe that thoughts on removing water and salts that penetrated the Charles Bridge during unsatisfactory repairs in the 1970’s and on which the other method is based. Also, this method would have necessitated removing all the bridge sections above the arches. An intervention like that should not be acceptable by historical institutions and the general public alike.

 

Spodní část pilíře mostu. V detailu je rozpoznatelné poškození pískovcových kvádrů. Pracoviště oprav mostu. Opravovaná část je vždy zakryta aby nedocházelo ke zbytečnému zakékání dešťové vody do vnitřností mostu.

 

Otevírací doba muzea

pondělí až neděle
letní provoz (květen - září) od 10:00 do 20:00
zimní provoz (říjen - duben) od 10:00 do 18:00

Contact

Křižovnické náměstí 3, Praha 1
Phone: 775 311 717
web design by emocio